Projects Portfolio
Explore our extensive track record of delivering high-stakes infrastructure, massive earthworks, and specialized architectural projects across Malaysia.
The following landmark infrastructure projects highlight the specialized technical execution and leadership capabilities of AVN SB's founding engineers and key personnel across their professional tenure.
Comprehensive Engineering Track Record
A detailed ledger of our technical executions and structural implementations across major Malaysian infrastructure.
| Project Name | Category | Key Execution | Location |
|---|---|---|---|
| Electrified Double Track Project (EDTP) Gemas to Johor Bahru | Elevated Infrastructure | Viaduct construction and segmental box girder erection | Johor |
| Sedenak Tech Park (STeP) Hyperscale Facility | Mission-Critical Civil Works | Heavy structural foundations and vibration-resistant earthworks | Johor |
| LRT3 (Shah Alam Line) | Elevated Infrastructure | Klang elevated guideway construction and concrete piers | Selangor |
| Tun Razak Exchange (TRX) Infrastructure | Deep Excavation | Deep basement excavation and earth-retaining structural walls | Kuala Lumpur |
| Cyberjaya Utility Corridor | Trenchless Engineering | Horizontal directional drilling (HDD) for high-voltage utilities | Selangor |
| SUKE Expressway (Cheras Segment) | Elevated Infrastructure | Post-tensioned bridge structures and highway overpasses | Kuala Lumpur |
| Pengerang Integrated Petroleum Complex (PIPC) | Advanced Geotechnical | High-pressure grouting and massive ground improvement works | Johor |
| East Coast Rail Link (ECRL) | Subterranean Transit | Preliminary tunnel boring support and excavation logistics | Pahang |
| Penang South Reclamation (PSR) | Advanced Geotechnical | Specialized soil stabilization and retaining structures | Penang |
| Langat 2 Water Treatment Plant | Trenchless Engineering | Precision micro-tunnelling for subterranean water mains | Selangor |
| DASH Expressway (Damansara Segment) | Elevated Infrastructure | Elevated interchange construction and heavy lifting operations | Selangor |
| RTS Link (Johor Bahru to Singapore) | Elevated Infrastructure | Marine viaduct foundations and pile cap execution | Johor |
| Central Spine Road (CSR) Package 3 | Advanced Geotechnical | Contiguous bored pile (CBP) walls for slope stabilization | Pahang |
| Nusajaya Data Center Park | Mission-Critical Civil Works | Heavy-load piling and structural concrete execution | Johor |
| Banting Industrial Utility Plant | Trenchless Engineering | Pipe jacking works for industrial wastewater routing | Selangor |
| West Coast Expressway (WCE) Kapar Section | Advanced Geotechnical | Soil treatment and foundational highway earthworks | Selangor |
| KVMRT Line 2 (Putrajaya Line) | Deep Excavation | Subterranean station box support and anchor installation | Kuala Lumpur |
| Bayan Lepas LRT Preparatory Works | Advanced Geotechnical | Preliminary geotechnical surveys and piling logistics | Penang |
| KLIA Aeropolis Upgrades | Deep Excavation | Underground utility trenching and concrete reinforcements | Selangor |
| Johor Bahru Outer Ring Road | Elevated Infrastructure | Bridge strengthening and structural remediation | Johor |







