Projects Portfolio

Explore our extensive track record of delivering high-stakes infrastructure, massive earthworks, and specialized architectural projects across Malaysia.

The following landmark infrastructure projects highlight the specialized technical execution and leadership capabilities of AVN SB's founding engineers and key personnel across their professional tenure.

Pan Borneo Highway, Sematan to Lundu Package (WPC-02)
Completed

Elevated Infrastructure

Pan Borneo Highway, Sematan to Lundu Package (WPC-02)

Heavy earthworks and highway construction management for this crucial starting package.

Client

JKR Malaysia

KVMRT Line 1 (SBK Line), Muzium Negara Station
Completed

Deep Excavation & Civil

KVMRT Line 1 (SBK Line), Muzium Negara Station

Integration of underground tunnels and at-grade railways for complex urban transit systems.

Client

MRT Corp

Subterranean Utility Corridor, Cyberjaya
Completed

Trenchless & Tunnelling

Subterranean Utility Corridor, Cyberjaya

Routing critical utilities beneath active technology park sectors without disrupting surface operations.

Client

Multimedia Development Corporation

Langat 2 Water Treatment Plant Pipe Jacking
Completed

Trenchless & Tunnelling

Langat 2 Water Treatment Plant Pipe Jacking

Routing subterranean water mains under heavily built-up residential areas using precision micro-tunnelling.

Client

PAAB

SUKE Expressway Elevated Viaducts
Completed

Elevated Infrastructure

SUKE Expressway Elevated Viaducts

Constructing multi-tier elevated highway segments over live, heavily congested traffic arteries.

Client

PROLINTAS

RTS Link Marine Viaduct Foundations
Completed

Elevated Infrastructure

RTS Link Marine Viaduct Foundations

Driving marine foundations and constructing viaducts across an active international strait.

Client

MRT Corp

KVMRT Line 2 (Putrajaya Line), Subterranean Alignment
Completed

Deep Excavation & Civil

KVMRT Line 2 (Putrajaya Line), Subterranean Alignment

Executing deep excavation within unpredictable geological formations.

Client

MRT Corp

Sedenak Tech Park (STeP) Hyperscale Facility Civil Infrastructure
Ongoing

Deep Excavation & Civil

Sedenak Tech Park (STeP) Hyperscale Facility Civil Infrastructure

Delivering massive, vibration-resistant structural foundations required for hyperscale data centers.

Client

JCorp

Comprehensive Engineering Track Record

A detailed ledger of our technical executions and structural implementations across major Malaysian infrastructure.

Project NameCategoryKey ExecutionLocation
Electrified Double Track Project (EDTP) Gemas to Johor BahruElevated InfrastructureViaduct construction and segmental box girder erectionJohor
Sedenak Tech Park (STeP) Hyperscale FacilityMission-Critical Civil WorksHeavy structural foundations and vibration-resistant earthworksJohor
LRT3 (Shah Alam Line)Elevated InfrastructureKlang elevated guideway construction and concrete piersSelangor
Tun Razak Exchange (TRX) InfrastructureDeep ExcavationDeep basement excavation and earth-retaining structural wallsKuala Lumpur
Cyberjaya Utility CorridorTrenchless EngineeringHorizontal directional drilling (HDD) for high-voltage utilitiesSelangor
SUKE Expressway (Cheras Segment)Elevated InfrastructurePost-tensioned bridge structures and highway overpassesKuala Lumpur
Pengerang Integrated Petroleum Complex (PIPC)Advanced GeotechnicalHigh-pressure grouting and massive ground improvement worksJohor
East Coast Rail Link (ECRL)Subterranean TransitPreliminary tunnel boring support and excavation logisticsPahang
Penang South Reclamation (PSR)Advanced GeotechnicalSpecialized soil stabilization and retaining structuresPenang
Langat 2 Water Treatment PlantTrenchless EngineeringPrecision micro-tunnelling for subterranean water mainsSelangor
DASH Expressway (Damansara Segment)Elevated InfrastructureElevated interchange construction and heavy lifting operationsSelangor
RTS Link (Johor Bahru to Singapore)Elevated InfrastructureMarine viaduct foundations and pile cap executionJohor
Central Spine Road (CSR) Package 3Advanced GeotechnicalContiguous bored pile (CBP) walls for slope stabilizationPahang
Nusajaya Data Center ParkMission-Critical Civil WorksHeavy-load piling and structural concrete executionJohor
Banting Industrial Utility PlantTrenchless EngineeringPipe jacking works for industrial wastewater routingSelangor
West Coast Expressway (WCE) Kapar SectionAdvanced GeotechnicalSoil treatment and foundational highway earthworksSelangor
KVMRT Line 2 (Putrajaya Line)Deep ExcavationSubterranean station box support and anchor installationKuala Lumpur
Bayan Lepas LRT Preparatory WorksAdvanced GeotechnicalPreliminary geotechnical surveys and piling logisticsPenang
KLIA Aeropolis UpgradesDeep ExcavationUnderground utility trenching and concrete reinforcementsSelangor
Johor Bahru Outer Ring RoadElevated InfrastructureBridge strengthening and structural remediationJohor