Pan Borneo Highway, Sematan to Lundu Package (WPC-02)
Elevated InfrastructureCompletedClient: JKR MalaysiaLocation: Sarawak

Pan Borneo Highway, Sematan to Lundu Package (WPC-02)

Technical Scope & Execution

Scope Summary

Heavy earthworks and highway construction management for this crucial starting package.

Technical Details

  • 1

    Massive highway earthworks across challenging tropical terrain

  • 2

    Construction of multiple elevated bridges and box culverts

  • 3

    Regional logistics management for heavy materials transport

Project Gallery

Pan Borneo Highway, Sematan to Lundu Package (WPC-02) Gallery Image 1
Pan Borneo Highway, Sematan to Lundu Package (WPC-02) Gallery Image 2
Pan Borneo Highway, Sematan to Lundu Package (WPC-02) Gallery Image 3

Sustainable & ESG Implementation

Pioneered sustainable spoil management by repurposing excavated earth for local flood mitigation embankments.